Global FPSO decommissioning insights 2024
There is an urgent need to assess the current global yard capacity against the number of expected floating units that will need to be decommissioned within the next two decades to ensure availability of suitable dismantling and recycling facilities. This Report details the number and location of FPSO units and other floating units that may become ready for decommissioning, and where suitable local recycling yards may be required.
Document Type: Report
Report Number: 2023dfi
Document Tags: Decommissioning
Published Date: 28 Aug 2024
Last Reviewed: 28 Aug 2024
Latest Version: 1.00