Global FPSO decommissioning insights 2024

2023dfi

There is an urgent need to assess the current global yard capacity against the number of expected floating units that will need to be decommissioned within the next two decades to ensure availability of suitable dismantling and recycling facilities. This Report details the number and location of FPSO units and other floating units that may become ready for decommissioning, and where suitable local recycling yards may be required.

Document Type: Report

Report Number: 2023dfi

Document Tags: Decommissioning

Published Date: 28 Aug 2024

Last Reviewed: 28 Aug 2024

Latest Version: 1.00